Introduction
Daylesford Organic Farm Shop, nestled in the rolling hills of the Cotswolds, is a premium
organic farm shop destination where wellness, sustainability and seasonal living come
together.
The Vision
Daylesford approached Worldwide Structures Ltd to supply a temporary structure to its
organic farm shop in the Cotswolds, over the winter period to increase its existing café
capacity. They the temporary extension to have the look and feel of the permanent
building, all within the confines of the small courtyard adjacent to the shop. The temporary
building had to be connected to the existing permanent building.
The System
Due to the unique nature of the Space Building System, we were able to deliver a 10m x
12.5m single storey flat roof structure with solid and glazed architectural panels. This
structure was constructed on a multi-level decked platform, within a walled courtyard. In
addition to the standard building system, we also delivered, an insulated ceiling lining, the
electrical fit-out and premium vinyl floor covering. In order to connect the temporary
structure to the existing access and egress points of the existing permanent structure, we
manufactured 2 linking tunnels. This allowed for a seamless transition between the 2
structures.
We Delivered
- A temporary structure, into an enclosed area, without the need for plant equipment, whilst the shop continued to trade without disturbance.
- A Weatherproof inter-connecting section, allowing customers a seamless transition between the existing building and the temporary structure.
- Detailed technical drawings and advice to other sub-contractors, to ensure a trouble-free installation within budget and on time.